← Back to JournalNews·08/12/2026Ciputra Residence during structural works←→01 / 12The structural phase on record — the stage that decides how precisely every later finish can sit.More entriesAll entries →News·08/05/2026M1515: internal inspection of the plastering worksZMA's supervisors sign off flatness and coat thickness before the next trade is allowed to start.News·07/28/2026M2303 under constructionA site diary of apartment M2303 at Mandarin Garden, from shell to interior fit-out.Blog·07/15/2026Moodboards in interior designWhy every ZMA interior scheme starts with a moodboard, before a single line is drawn.