← Back to JournalNews·07/28/2026M2303 under construction←→01 / 23A site diary of apartment M2303 at Mandarin Garden, from shell to interior fit-out.More entriesAll entries →Blog·07/15/2026Moodboards in interior designWhy every ZMA interior scheme starts with a moodboard, before a single line is drawn.News·08/20/2026H Villa tops out after four months on siteThe structural frame is complete and true to the drawings. The site now moves into finishing.News·08/12/2026Ciputra Residence during structural worksThe structural phase on record — the stage that decides how precisely every later finish can sit.